Yates Associates were invited to undertake the design of a new replacement electrical switch panel located in the basement of Crockfords Club in Curzon Street, Mayfair, London. As it was not possible to arrange for a 48-hour period shutdown, in order to enable the Installation, the project was undertaken in co-ordinated mini stages.

You may also like

Back to Top